posted by | No comments

WEBSITE

 

Aircare have been awarded the contract for a major refurbishment on the refrigeration plant at a national food processing site.  Aircare designed, manufactured and installed the equipment back in 1997/1998 and the equipment has operated 24/7 for over 17 years.

The plant comprises of blast and spiral quick freezers, frozen and chilled storage rooms, and chilled production areas.  The client has been satisfied with the equipment for the past 17 years and wanted the equipment updated for another 17 years of reliable operation.

The works involve replacing the refrigerants with modern environmentally friendly refrigerants, updating the controls and control systems for reduced energy consumption, and replacing the outdoor heat exchangers due to age and weather damage.

90% of the existing equipment will remain in service after refurbishment.

“This is a perfect example of recycling high quality equipment and minimising environmental impact and the carbon footprint”.  

 

Customer Testimonials