Photo1

The client required a drying system incorporating biomass hot water boilers to reduce the drying time of various biomass fuels and provide grain drying during harvest times.

Aircare designed and installed a heating and dehumidification system that is capable of supplying 24 m3/s of warm dry air to the biomass fuel and grain drying areas.  The systems incorporate 100kW heating coils, industrial supply air fans, water pipe work, ductwork, controls and auxiliary equipment.  To ensure minimal energy use the fans are inverter driven and a user friendly control system to optimise operational times.

This new system has reduced energy consumption and operation costs by up to 80%.