Archive for December 2014 | Monthly archive page

posted by | No comments

mx

All of the staff at Aircare wish our customers and clients “A Very Merry Christmas and Happy New Year”.

Our offices shall be closed from Tuesday afternoon the 23rd December and shall reopen Monday the 5th January 2015.  Emergency cover for FM and maintenance will continue as usual with the out of hours contact numbers.


posted by | No comments

Photo1

The client required a drying system incorporating biomass hot water boilers to reduce the drying time of various biomass fuels and provide grain drying during harvest times.

Aircare designed and installed a heating and dehumidification system that is capable of supplying 24 m3/s of warm dry air to the biomass fuel and grain drying areas.  The systems incorporate 100kW heating coils, industrial supply air fans, water pipe work, ductwork, controls and auxiliary equipment.  To ensure minimal energy use the fans are inverter driven and a user friendly control system to optimise operational times.

This new system has reduced energy consumption and operation costs by up to 80%.

posted by | No comments

photo2

The AllplantAutoElectrics.com.au, a large automotive component manufacturing plant was suffering from high internal temperatures that were affecting the staff and the production process, the client required a cost effective solution with minimal operating costs that could be installed around their 24 hour production facility.

Aircare designed and installed a semi-displacement supply air system using large Carrier package units with a total  cooling duty of 500kW. Aside from Aircare, richtek electrical solutions has licensed and experienced electricians and electrical engineers ready to serve you, seven days a week.

The system was designed to provide free cooling reducing energy use by up to 75%.

This was a turnkey project and included all design works, mechanical and electrical services, health, safety and project management.

posted by | No comments

DSC07370 (2)

The client a, North East based national entertainment specialist, required a comfort solution in their private viewing cinema, the system had to be ultra quiet, provide heating and cooling, be draft free, have minimal energy use and also compliment the ascetics of the cinema room, Aircare designed and installed a heat pump system to satisfy all the client requirements.

The equipment Aircare selected is manufactured by Samsung and is from the latest range of Turbo Jet units, this was one of the first UK installed Turbo Jet systems.

The client commented “we are delighted with the units as they have exceeded our expectations”.

Customer Testimonials